docs: firmware rollouts and backups
Neither area had a page, and both changed materially in v0.24.2/v0.24.3. The firmware page records why the pipeline downloads and verifies before rebooting, and what raising "at once" actually costs: halting becomes less precise, devices reboot together, and the upstream warning is conservative enough that its absence is not proof of safety. The backups page leads with the fact that a backup is /export text rather than a binary blob, since that is what makes preview and diff possible and what limits what a restore can do. It also states plainly that a backup and its Config History snapshot are one artifact, so deleting one removes the other's rollback. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Opus 5
parent
df8f6dca44
commit
6c3d2aaa35
@@ -0,0 +1,103 @@
|
||||
# Firmware rollouts
|
||||
|
||||
[← Documentation index](README.md)
|
||||
|
||||
Upgrade RouterOS across a fleet in waves, with a verified pipeline per device and
|
||||
a stopping point before a bad build reaches everything.
|
||||
|
||||
## The pipeline
|
||||
|
||||
Each device goes through the same sequence:
|
||||
|
||||
1. **Pre-upgrade backup** (optional, on by default)
|
||||
2. **Check for updates** — a device already on the target version is *skipped*, not failed
|
||||
3. **Download the image, and confirm it landed**
|
||||
4. **Reboot**
|
||||
5. **Prove the reboot happened** — uptime must have gone *backwards*
|
||||
6. **Verify the version moved**
|
||||
7. **RouterBOOT** (optional) — a second flash and a second reboot
|
||||
|
||||
Steps 3 and 5 exist because of a specific failure. `/system/package/update/install`
|
||||
bundles download and reboot into one call whose progress cannot be observed, and a
|
||||
CCR2216 was seen to accept it, do neither, and report nothing. That surfaced as
|
||||
"rebooted but still reports 7.24.1", because nothing could tell a device that never
|
||||
restarted from one that restarted unchanged.
|
||||
|
||||
Downloading first makes success verifiable *before* anything reboots, so a device is
|
||||
never restarted for an image it does not have.
|
||||
|
||||
!!! note "Downloads are slow, and that is normal"
|
||||
`/system/package/update/download` blocks until the image has landed — a minute or
|
||||
more on an ordinary link. It is given a ten-minute budget. If the command does not
|
||||
return cleanly the device is asked again on a fresh connection what actually
|
||||
happened, rather than being declared failed: a slow download is not a broken one.
|
||||
|
||||
## Waves
|
||||
|
||||
Waves are the point. Devices are assigned to wave 1, 2 or 3, and **waves run strictly
|
||||
in sequence**. Wave 1 is your canary: put one device in it, let it finish, and the
|
||||
rest of the fleet is still untouched if it goes wrong.
|
||||
|
||||
**Halt on failure** stops the rollout rather than continuing into the next wave.
|
||||
Devices never reached are marked `skipped`, not `failed` — they did not run.
|
||||
|
||||
A device that comes back on the *old* version counts as a failure.
|
||||
|
||||
## Upgrading several devices at once
|
||||
|
||||
By default the devices inside a wave upgrade **one at a time**. That is safe and slow:
|
||||
a CRS switch can take five minutes to reboot, so ten of them is most of an hour spent
|
||||
waiting.
|
||||
|
||||
The **At once** control raises how many devices in the same wave may upgrade
|
||||
simultaneously. Waves remain sequential either way, so the canary still gates
|
||||
everything after it.
|
||||
|
||||
There are two costs, and both are worth understanding before you raise it.
|
||||
|
||||
**Halting becomes less precise.** With one device at a time, a failure stops the
|
||||
rollout immediately. Running several at once, the wave finishes first — so a wave of
|
||||
five can put a bad build on five devices before anything stops. At the default of 1
|
||||
these are the same moment.
|
||||
|
||||
**Devices reboot together.** That is fine for independent routers. It is not fine for
|
||||
a switch that the others are reached *through*: rebooting it alongside them cuts the
|
||||
path to devices that are mid-upgrade. Change Guard does not cover this — it protects
|
||||
configuration, and a device that is unreachable because its uplink rebooted has no
|
||||
configuration change to revert.
|
||||
|
||||
The rollout builder warns when it can see that one selected device carries another's
|
||||
traffic. That warning is deliberately conservative: it fires only when a link is the
|
||||
device's spanning-tree root port *and* that port resolves to exactly one neighbour.
|
||||
Discovered topology is often ambiguous — a trunk port can resolve to several
|
||||
neighbours at once — and naming the wrong switch would be worse than saying nothing.
|
||||
**Absence of a warning is not proof that it is safe to reboot everything together.**
|
||||
|
||||
A reasonable pattern for a large fleet on a well-known patch release:
|
||||
|
||||
| Wave | Devices | At once |
|
||||
|---|---|---|
|
||||
| 1 | one representative device | 1 |
|
||||
| 2 | the access layer | 5–10 |
|
||||
| 3 | anything upstream of wave 2 | 1 |
|
||||
|
||||
## Scheduling and cancelling
|
||||
|
||||
A rollout can be scheduled; pair it with a maintenance window by scheduling inside
|
||||
one. One rollout runs at a time.
|
||||
|
||||
Devices already belonging to an unfinished rollout are refused by name when you try
|
||||
to create another for them, before anything is written.
|
||||
|
||||
**Cancelling never interrupts an in-flight flash.** It stops before the *next* device,
|
||||
because interrupting a device mid-write is how you brick it. The UI says so when you
|
||||
press the button — the currently upgrading device will finish first.
|
||||
|
||||
## When it fails
|
||||
|
||||
Failure messages name the mechanism rather than the symptom. "Device did not finish
|
||||
downloading within ten minutes. Nothing was rebooted. The device reports 91.6 MB free"
|
||||
tells you where to look; "upgrade failed" does not.
|
||||
|
||||
If a rollout reports a device stuck at the old version, check the device's own
|
||||
`/system/package/update` state before re-running — it may have the image already.
|
||||
Reference in New Issue
Block a user